Skip to main content

Adaptive Reuse

Oxford Properties and Pioneer Group Create London Life Science Center

Published 3/19/2024

Oxford Properties is transforming Victoria House in central London into a vibrant destination for biomedical research. Developed in partnership with Pioneer Group, the £70 million project involves the conversion of 220,000 sf of the building's 300,000-sf internal area to provide sophisticated wet labs and write-up areas.

Read More

Creating BSL-3/ABSL-3 Research Space in Existing Facilities

Published 3/13/2024

Increasing demand for BSL-3 and ABSL-3 lab space in the wake of the COVID-19 pandemic is driving up interest in renovating existing research facilities to accommodate these high-containment spaces. Even a small BSL-3 lab can be a costly undertaking, with special attention required for security of both personnel and biohazards, location in the building, and waste disposal, as well as the design and commissioning of exhaust system.

Read More

Regeneron Pharmaceuticals Acquires Avon Innovation Center

Published 3/1/2024

Regeneron Pharmaceuticals is planning to establish a biomedical research facility in Suffern, N.Y. The company recently invested $39 million to acquire the 235,000-sf Avon Innovation Center. Sited on 10 acres, the three-story structure originally housed chemistry labs and support spaces for the development of cosmetics, fragrances, and skincare products. HLW designed the facility, which was constructed between 2003 and 2005 by Skanska USA Building.

Read More

AstraZeneca Creates Cell Therapy Manufacturing Facility in Rockville

Published 2/26/2024

AstraZeneca is investing $300 million to establish a cell therapy manufacturing facility in Rockville, Md. Developed by Alexandria Real Estate Equites, the Class A+ property is located in the vibrant innovation ecosystem of the Alexandria Center for Life Science at Shady Grove. AstraZeneca has executed a 13-year lease for the entire 84,264-rsf building.

Read More

Canada’s Largest Research Healthcare System Adapts to Hybrid Work

Published 2/14/2024

University Health Network of Toronto, Canada’s largest research healthcare system, increased space efficiency and improved employee morale by reengineering its practices and workspaces to accommodate a hybrid work model. Of the 6 million sf occupied by the network, 1 million sf was office space, 200,000 sf of which was used by people who could be hybrid workers. The transition required a concentrated change management strategy, an investment in technology, and a reconfiguration of space and the way it was managed.

Read More

Michigan State University Employs Modular Systems and Mass Timber to Transform an Old Power Station Into a Cutting-Edge STEM Teaching Facility

Published 1/31/2024

Michigan State University’s first new instructional building in 50 years incorporates the disparate elements of a long-mothballed power plant, modular infrastructure, and mass timber. The facility on the East Lansing campus consolidates MSU’s large core undergraduate STEM courses under one roof, with both wet and dry teaching labs, classrooms, and student support space.

Read More

Phased Rehab Saves Problematic University Building from Demolition

Published 1/17/2024

The University of Colorado Boulder saved a mid-century building from demolition by refurbishing it -- and funding it -- in stages. They continued to use the building as the students and faculty decided the best use for each space, overcoming issues of low floor-to-floor heights, inadequate mechanical systems, and asbestos. 

Read More

University of Minnesota Begins Construction on Chemistry Undergraduate Teaching Labs Initiative

Published 12/22/2023

The University of Minnesota is renovating and expanding the historic Fraser Hall to create a central destination for chemistry programs on the Twin Cities campus. Designed by VJAA and BWBR Architects, the $144.7 million Chemistry Undergraduate Teaching Laboratories initiative involves the demolition of a portion of the existing building, a 95-year-old law library, and the removal of an addition built in 1954.

Read More

Prince Street Partners Plans Redwood City Life Science Complex

Published 12/20/2023

Prince Street Partners is planning a 282,000-sf life science complex in Redwood City, Calif. Designed by Brick, now part of HGA, the project involves the adaptive reuse of an existing 85,000-sf building and the demolition of two other structures. A new five-story, 197,000-sf facility sited atop a two-level garage will be constructed to provide leasable lab and office environments for BSL-1 and BSL-2 research programs.

Read More

HITT Contracting Plans Sustainable Headquarters

Published 12/14/2023

HITT Contracting will relocate its headquarters to a planned 270,000-sf development in Falls Church, Va. Designed by Gensler, the six-story facility will advance the firm's aspiration to redefine the future of construction through innovation, partnership, and sustainability. The project involves the transformation of an existing office structure, previously a satellite campus operated by Virginia Tech, into a collaborative educational hub for the built environment.

Read More

Mayo Clinic Plans Rochester Campus Redevelopment

Published 12/11/2023

Mayo Clinic is planning a $5 billion redevelopment and expansion of its healthcare campus in Rochester, Minn. Designed by Foster + Partners and CannonDesign, the strategic initiative will introduce new facilities that combine innovative care concepts and digital technologies to transform the patient experience, advance translational research, and improve outcomes. Comprising five new buildings, related infrastructure, and utilities, the project will provide a total of approximately 2.4 million sf of space.

Read More

Rochester Institute of Technology Constructs Research Building

Published 12/8/2023

Rochester Institute of Technology (RIT) is constructing a 39,200-sf research facility to catalyze innovation and discovery in engineering, computing, and the sciences. Built to accommodate unknown end users, the two-story structure will offer 18 flexible laboratories that can be customized to support wet, dry, or multimodal programs. The highly adaptable project was designed by HBT Architects, now part of MRB Group. DGA Builders is acting as construction manager with occupancy anticipated in fall of 2024.

Read More

The Georgetown Company Plans Manhattan Life Sciences Center

Published 12/6/2023

The Georgetown Company is planning to construct a 185,000-sf life sciences center in the Hell's Kitchen district of Manhattan in New York City. Created in partnership with Beacon Capital and ZoE Life Sciences, the seven-story facility will provide purpose-built research environments for biomedical and pharmaceutical tenants. The highly collaborative structure will offer flexible floorplates starting at 31,000 sf that can accommodate a variety of lab and office configurations.

Read More

University of Nebraska Medical Center Breaks Ground on Campus Operations and Research Excellence Building

Published 11/30/2023

University of Nebraska Medical Center broke ground in November of 2023 on the $105 million Campus Operations and Research Excellence (CORE) building in Omaha. Designed by LEO A DALY, the six-level, 180,870-gsf structure will feature three stories of state-of-the-art wet labs, including a 30,800-sf floor for research programs in oncology, drug discovery, and other strategic priorities. Approximately 61,600 sf of leasable shell space will accommodate private tenants or supply additional capacity for future growth.

Read More

Walker Hall Renewal and Seismic Corrections

Published 11/15/2023

The University of California, Davis, transformed a vacant 1920s-era agricultural engineering building in need of seismic repair into a much-needed hub for graduate and post-graduate students—reinforced to be resilient and sustainable enough to be awarded LEED Platinum. 

Read More