Skip to main content

Latest Reports

Tradeline's industry reports are a must-read resource for those involved in facilities planning and management. Reports include management case studies, current and in-depth project profiles, and editorials on the latest facilities management issues.

Energy Biosciences Building

Published 3/5/2014

The Energy Biosciences Building at the University of California, Berkeley, is a facility for the Energy Biosciences Institute (EBI), a 10-year, $500 million program created to address challenges in climate change and the rising price and diminishing supplies of carbon-based fossil fuels by applying the advanced knowledge of biological processes, materials, and mechanisms.

Read More

Integrating Data Collection with FM System Reduces Lifecycle Costs

Published 2/26/2014

Efficiently capturing facility management data about a new building or recently installed equipment saves time and money for the plant operations team after construction is completed. The process begins with selecting the most appropriate model for collecting the information and properly integrating it into the facility management system at the inception of a project. Building information modeling (BIM) is a critical component in data collection.

Read More

Energy Production Infrastructure Center (EPIC)

Published 2/26/2014

The Energy Production Infrastructure Center (EPIC) at the University of North Carolina, Charlotte, brings together the traditional disciplines of civil, environmental, computer, and electrical engineering in a collaborative, innovative research and teaching community. Activities are focused on the development of energy and power production, from microchip fabrication and development of new structural materials to solar and wind power.

Read More

Vertical Challenges at the Peter Gilgan Centre for Research and Learning

Published 2/19/2014

The Peter Gilgan Centre for Research and Learning at The Hospital for Sick Children (SickKids) in Toronto is the largest high-rise pediatric health research facility in Canada, challenging designers to create a collaborative research environment in a 21-story tower. Completed in September 2013, the $400 million CDN ($376 million USD) research tower brings together in one central location about 240 principal investigators and 2,000 trainees and staff, formerly spread out in six Toronto locations.

Read More

What's New in Academic Medical Health Science Centers?

Published 2/19/2014

The following is a condensed transcript of a panel discussion that took place at Tradeline’s Academic Medical and Health Science Centers 2013 Conference. The panelists are Ian McDermott, senior director of MedRIST, University Health Network, and Scott Kelsey, managing principal at CO Architects. The moderator is Derek Westfall, president of Tradeline.

Read More