Skip to main content

Higher Education

SUNY Upstate Medical Center Constructs Second Phase of Biotech Accelerator

Published 8/17/2015

SUNY Upstate Medical Center began construction in June of 2015 on the second phase of the Central New York Biotech Accelerator (CNYBAC) in Syracuse, N.Y. Designed by The S/L/A/M Collaborative, the project includes the build out of the second and third floors of the facility to house the Upstate Medical Innovation and Novel Discovery Center (MIND) and the Molecular Pathology Next Generation Sequencing Lab.

Read More

Seton Hill University Opens Boyle Health Science Center

Published 8/16/2015

Seton Hill University opened the $23 million JoAnne Woodyard Boyle Health Science Center in July of 2015 in Greensburg, Pa. Designed by MacLachlan, Cornelius and Filoni, the 52,000-sf project provides teaching and research labs, classrooms, faculty offices, and a lecture hall for the Division of Natural and Health Sciences. The center features a three-story glass atrium, a 20-table physician assistant training lab, and a gross anatomy facility.

Read More

University of Bristol Expands School of Engineering

Published 8/15/2015

The University of Bristol is initiating an expansion of the Queens School of Engineering in the United Kingdom. The 15,400-sf wing will provide a multipurpose teaching auditorium, an electrical engineering teaching lab, a propulsion lab, research offices, and student meeting space. The general contractor for the project is Willmott Dixon with WSP-Parsons Brinckerhoff as structural and civil engineering consultant. Occupancy is expected in fall of 2017.
 

Read More

University of Tennessee Health Science Center Plans Center for Sterile Drug Delivery Systems

Published 8/13/2015

The University of Tennessee Health Science Center will begin construction in early fall of 2015 on the $16 million Plough Center for Sterile Drug Delivery Systems in Memphis. An existing 32,000-sf facility will be renovated to support the manufacture of pharmaceutical products for clinical trials. Designed by brg3s Architects and ETFC Architects to meet GMP (Good Manufacturing Practice) standards, the center will feature three 800-sf modular cleanroom pods created by G-CON Manufacturing.

Read More

Tsinghua University Expands Jinping Underground Lab

Published 8/12/2015

Tsinghua University is expanding the Jinping Underground Laboratory in Liangshan, China. The project will increase the size of the lab, which is located 7,874 feet below the surface, to 1,291,000 sf. Supporting advanced research on dark matter, the expansion will allow more experiments to run concurrently in a location shielded from interfering cosmic rays. Completion is expected in late 2015. The Jinping Underground Laboratory opened in December of 2010.

Read More

University of Florida Opens Medical Education Building

Published 8/11/2015

The University of Florida opened the $46 million Harrell Medical Education Building in late July of 2015. Located on the Health Science Center campus in Gainesville, the four-story, 95,000-sf facility will support the College of Medicine’s interactive, team-based curriculum. The project features two 4,600-sf academic spaces designed to accommodate group learning at circular tables and a medical training center with 18 standardized patient exam rooms.

Read More

University of Houston Expands Sugar Land Campus

Published 8/8/2015

The University of Houston is expanding its Sugar Land campus with the construction of a 150,000-sf academic building. Supported by $54 million in state funding, the facility will provide classrooms for the UH College of Technology, as well as support programs in business, health science, and education. Completion is expected in 2019.

Read More

Oregon State University Plans Forest Science Complex

Published 8/6/2015

Oregon State University is planning to build a $60 million Forest Science Complex in Corvallis. The 85,000-sf project includes construction of the 20,000-sf Advanced Wood Building Products Laboratory, which will feature a strong floor for full-scale product testing, high-bay research space, and robotic manufacturing systems. An academic building supporting programs in forestry, wood science, and renewable materials will also be constructed. Both facilities will open in fall of 2017.

Read More

Colorado State University Plans Equine Veterinary Hospital

Published 8/4/2015

Colorado State University is planning to build the $47 million Helen and Arthur E. Johnson Family Equine Hospital in Fort Collins. The 180,000-sf project will provide advanced diagnostic and surgical services, and house eight biosecure isolation stalls for the treatment of horses with infectious diseases. Supporting 27 equine clinicians, the hospital will feature imaging technologies, including a high-resolution computed tomography (CT) scanner. A 3 Tesla MRI will be installed in a new CSU research building adjacent to the facility.

Read More

Abu Dhabi University Constructs Engineering Facility

Published 7/31/2015

Abu Dhabi University began building a $10 million egnineering facility in July of 2015. Designed to meet international teaching and research standards, the 99,000-sf addition will provide 30 laboratories for civil, mechanical, electrical, computer, and chemical engineering, as well as supporting programs in architecture, interior design, information technology, and aviation. The building will also house 12 classrooms, 110 faculty offices, and conference rooms. Occupancy is expected in August of 2016.

Read More

Convergence of Engineering and Medical Science Drives New Approaches to Strategic Planning

Published 7/29/2015

The University of Maryland is building a state-of-the-art engineering teaching and research building for the era of convergence science. It is designed to facilitate the practical integration of bioscience, medicine, and engineering to develop new biomedical devices and other health-related advancements. When it opens in 2017, the six-floor, 184,000-sf A. James Clark Hall will serve as a national center for innovation that combines engineering with biology, medicine, and information technology in support of private and government partnerships.

Read More

Center for Sciences and Innovation

Published 7/29/2015

The 280,000-sf Center for the Sciences and Innovation (CSI) is the largest development ever undertaken on the campus of Trinity University. The phased project includes 150,000 gsf of new construction, an 80,000 gsf gut renovation of Cowles Life Sciences Building, and a light renovation of the 50,000-gsf Marrs McLean Hall, to create an integrated academic complex. It houses teaching and research labs, an engineering studio, greenhouse, vivarium, and an Innovation Studio, and is home to the university-wide Entrepreneurship Center.

Read More

Oregon State University Expands Forest Science Complex

Published 7/28/2015

Oregon State University is planning a $60 million expansion of the Oregon Forest Science Complex in Corvallis. The 85,000-sf building will provide additional teaching and research space for the College of Forestry as well as housing the 20,000-sf Advanced Wood Building Products Laboratory. Constructed with a strong floor to accommodate full-scale experiments, the lab will feature a high bay area and an advanced manufacturing center utilizing robotoic technologies.

Read More

University of Missouri Breaks Ground on Patient-Centered Care Learning Center

Published 7/27/2015

The University of Missouri School of Medicine broke ground in July of 2015 on the $42.5 Patient-Centered Care Learning Center in Columbia. The 97,000-sf facility will provide simulation training suites, an anatomy learning center, an auditorium, classrooms, offices, conference rooms, and 30,400 sf of Patient-Based Learning (PBL) labs. The project is designed by BNIM of Kansas City and is being built by J.E. Dunn Construction Group. Occupancy is expected in 2017.

Read More

Penn State Opens Health and Human Development Building

Published 7/24/2015

The Pennsylvania State University opened the $59 million Health and Human Development Building in University Park in July of 2015. Designed by Bohlin Cywinski Jackson, the 140,000-sf facility provides laboratories, classrooms, conference rooms, a student commons, faculty offices, and administrative space to support the Department of Human Development and Family Studies. LEED sustainable design certification will be sought for the project, which includes 40,000 sf of renovated space in the former Henderson Building South.

Read More