Paul G. Allen Center for Global Animal Health

Published 9/4/2013

Washington State University’s three-story, 62,000-sf Paul G. Allen Center for Global Animal Health is the first of a two-phase project dedicated to infectious disease research and animal diagnostics. It houses the Paul G. Allen School for Global Animal Health, which provides innovative solutions to global infectious disease challenges through research, education, global outreach, and application of disease control at the human-animal interface. The second phase will be completion of the Washington Animal Disease and Diagnostic Laboratory.

Read More

UCSF Funds Sandler Neurosciences Center by Forging New Partnerships

Published 9/4/2013

The Sandler Neurosciences Center at the University of California, San Francisco (UCSF), is a developer-built facility created through innovative planning, development, design, and research. A public-private partnership—an alternative to the traditional design-bid-build model—applies private-sector efficiencies to an institutional project. Benefits include faster delivery, lower costs to build and operate, and reducing institutional risk by shifting responsibility for construction and ongoing maintenance to the developer.

Read More

Consolidated Forensic Laboratory

Published 8/28/2013

The 351,0000-gsf Consolidated Forensic Laboratory (CFL) in the District of Columbia serves the Department of Forensic Services, the Office of the Chief Medical Examiner, and the Department of Public Health. The building rises seven stories above ground; two below-grade levels contain evidence storage, vehicle exam, firing range/bullet recovery, lab/exam areas, BSL-3, autopsy, support lab areas, offices/conference space, and the parking garage.

Read More

Lean Principles Minimize Four Categories of Construction Waste

Published 8/28/2013

Getting the planning team on board with Lean project delivery from the outset of a project can net huge savings in both capital expenditures and long-term operating costs. A California hospital, for example, saved $700,000 and 550 sf per bed, and the project was completed 25 percent ahead of schedule, a level of efficiency that can be achieved in other industries, as well.

Read More

Weighing the Facilities Impact of Hiring New Researchers

Published 8/21/2013

Institutions that allow research strategy to drive their infrastructure will forge productive relationships with their primary investigators (PIs) from the start and yield better research results. The University Health Network (UHN) in Toronto, Canada, has successfully instituted procedures to take into account the financial and facility impact of potential research hires, which has positively impacted recruitment efforts and strengthened its research program.