Skip to main content

Healthcare

Cypress Fairbanks Medical Center Expands in Houston

Published 5/3/2004

Cypress Fairbanks Medical Center broke ground on a new $9-million expansion project in Houston on May 11, 2004. Adding a 12-bed intensive care unit in a newly constructed 27,000-sf, two-story building, the facility will have the capacity for 24 additional medical/surgical beds on the second floor. Upon completion, Cypress Fairbanks Medical Center will have approximately 180 licensed beds and 22 ICU beds; the existing ten-bed ICU will remain operational. Over 300 parking spaces will be added.

Read More

St. Joseph Hospital Builds Patient Care Tower

Published 4/30/2004

St. Joseph Hospital broke ground in March 2004 on a new four-story, 240,000-sf patient care tower in Orange, Calif. Complete with a full basement and a 13,000-sf central plant, the tower will feature 150 patient beds and 14 operating rooms. Built in a confined space between two healthcare facilities with round the clock operations, the tower is slated for completion in April 2007. The project architect is NBBJ of Seattle, with McCarthy as project contractor.

Read More

Tampa General Hospital Initiates Expansion Project

Published 4/28/2004

Tampa General Hospital has selected  Skanska USA Building to provide construction management services for a $120-million expansion project. The project’s construction value is estimated at $65 million. Comprised of a four-story addition over an existing surface parking area, the 280,000-sf project will provide a new emergency department and operating rooms, a new women’s center, a new cardiovascular center, and a new intensive care suite. To support the increased infrastructure, the central energy plant will also be expanded.

Read More

Centennial Medical Center Opens in Frisco

Published 4/28/2004

Centennial Medical Center, a 118-bed hospital in Frisco, Texas, will open in June 2004. A subsidiary of Tenet Healthcare Corp., the hospital cost approximately $125 million in construction and other costs.

 

Read More

Bourbon Community Hospital Completes Medical Offices and ER Modification

Published 4/25/2004

Bourbon Community Hospital has completed construction of a medical office building and emergency room modification in Paris, Ky. The single-floor, 11,200-sf, $1-million office facility will accommodate five tenants. The $1.3-million emergency room renovated the existing 1,700-sf department and expanded it by 6,300 sf. Both projects were designed by Sims Architectural Studio of Birmingham, Ala.

Read More

Johns Hopkins Hospital Plans Baltimore Complex

Published 4/20/2004

Johns Hopkins Hospital has completed the design of a new $47-million complex to be located in Baltimore, Md. Linked to the existing campus and the planned cardiovascular care tower and children’s hospital by a pedestrian bridge, the complex will include a 750,000-sf parking garage with 2,200 spaces, a 24-truck loading dock, a service tunnel, a central kitchen, and a distribution center. Designed by Thornton-Tomasetti-Cutts of Washington, D.C., the project is expected to reach completion in 2005.

Read More

Aurora Health Care Plans Town of Summit Medical Campus

Published 4/20/2004

Aurora Health Care is planning an $85-million, 88-bed hospital as part of a new medical campus on the Pabst Farms development in the Town of Summit, Wis. Sited on 184 acres, the new full-service hospital will feature the latest equipment for diagnosis and treatment, a comprehensive electronic medical record system, and all-digital diagnostics. 

 

 

Read More

Methodist Health System Plans Mansfield Hospital

Published 4/18/2004

Methodist Health System of Dallas is planning to construct a $100-million general acute-care hospital in Mansfield, Texas. Housing emergency room services, surgical accommodations, and 80 private rooms, the facility will be constructed on more than one million sf and will complement Methodist’s planned imaging center and physician offices in Midlothian. Construction is expected to begin by November 2004; the hospital could become operational in 28 months to three years.

Read More

Ellis Hospital Plans ICU

Published 4/14/2004

Ellis Hospital in Schenectady  is planning to break ground on a $20-million intensive care unit in October 2004. Replacing the current 20-bed facility that was built in 1973, the new unit will be relocated next to the hospital’s other critical care services. Construction on the 36-bed unit is expected to last about 18 months.

Read More

Arizona School of Dentistry Develops Mesa Facility

Published 4/13/2004

The Arizona School of Dentistry & Oral Health Clinic will begin construction in June 2004 on a 42,000-sf facility in Mesa, Ariz. The school will occupy 30,000 sf; the remaining space will be used as medical offices. Completion is expected in April 2005. The building will be located in the Arizona Health and Technology Park, a $100-million development planned by The Alter Group of Phoenix and the A.T. Still University of Health Sciences.

Read More

University of Colorado Health Science Center Redevelops Aurora Campus

Published 4/13/2004

The University of Colorado Health Sciences Center has selected California-based Shea Properties to redevelop its 30-acre 9th Avenue campus in Aurora, Colo. The campus, housing the 350-bed University Hospital, the Graduate School of Medicine, and the University of Colorado School of Medicine, Nursing, Dentistry, and Pharmacy, accommodates over 60 clinical treatment and research programs. Plans for the site describe a large mixed-use development including office, retail, residential, and parking.

Read More

Hospital Clermont Ferrand University Renovates and Relocates

Published 4/12/2004

Hospital Clermont Ferrand University has awarded a subsidiary of Pasadena, Calif.-based Jacobs Engineering Group the three-year, $117-million contract for a renovation and relocation project in Clermont-Ferrand, France. Working with France’s Architect Group 6, the project is the sixth on which the two companies have collaborated. A maternity facility will be integrated into the hospital’s general surgery complex as part of the project scope.

 

Read More

University of Pittsburgh Medical Builds Regional Cancer Center

Published 4/11/2004

The University of Pittsburgh Medical Center (UPMC) is joining with Jameson Health System in a 50-50 venture to create a $5-million regional cancer center in New Castle, Penn. The project will include the renovation of 6,500 sf in Jameson Health System’s Medical Arts Building and the construction of 1,000 sf of new clinical space. Operating as part of the UPMC Cancer Centers network, the facility will open in February 2005.

Read More