Skip to main content

Biomedical

Coventry University Builds Health and Life Sciences Facility

Published 1/31/2015

Coventry University will begin construction in mid-2015 on a $50 million facility for the Faculty of Health and Life Sciences in the United Kingdom. The five-story multidisciplinary building will provide classrooms, simulation suites for medical training, science labs, and core research space. The 121,200-gsf (75,500-nsf) project will be built by BAM Construction. Completion is expected by fall of 2017.

Read More

Illumina Plans Foster City Campus

Published 1/19/2015

Illumina is planning a 360,000-sf research campus in Foster City, Calif. Developed by BioMed Realty Trust, the build-to-suit project will include two highly flexible laboratory and office buildings as well as outdoor recreation areas. LEED Gold sustainable design certification will be sought for the campus, which is slated for completion in 2017. Illumina, a provider of genomic sequencing and diagnostics solutions, will initially lease the facilities for 15 years.

Read More

International Vaccine Centre (InterVac)

Published 1/7/2015

The three-story International Vaccine Centre (InterVac) at the University of Saskatchewan is one of the largest vaccine research centers in the world and the largest in North America. It is connected by a walkway to the Vaccine and Infectious Disease Organization (VIDO) laboratory building in a cluster of life sciences R&D facilities at the University. The facilities operate together as VIDO-InterVac, one of only a few BSL-3 facilities in the world that can accommodate disease and vaccine research involving animals as large as cows.

Read More

University of Maryland Builds Engineering Facility

Published 1/5/2015

The University of Maryland is building a new facility for the Clark School of Engineering in College Park. Ground was broken in November of 2014 on the 184,000-sf A. James Clark Hall, a collaborative, multidisciplinary facility created to support the development of advanced biomedical technologies. Designed by Ballinger, the building will provide a new home for the Fischell Department of Bioengineering and the Robert E. Fischell Institute for Biomedical Devices.

Read More

University of Utah Plans Crocker Science Center

Published 12/22/2014

The University of Utah will renovate the existing 71,000-sf George Thomas building to create the Gary & Ann Crocker Science Center in Salt Lake City. The existing structure will be seismically upgraded and reconfigured, and a 52,500-sf addition will be built to accommodate laboratories for the Cell and Genome Research Center. The completed four-story, 123,500-sf facility will also provide lecture halls, classrooms, a café, a business incubator, and a full-height atrium. The project team includes EDA Architects and Okland Construction.

Read More

University of Cambridge Constructs Research Facility

Published 12/19/2014

The University of Cambridge has awarded Kier Group a $91 million contract to build a new biomedical laboratory in the United Kingdom. The project will provide up to 180,000 sf of research space and will be located on the Cambridge Biomedical Campus. Site work will begin in mid-2015 with completion expected in summer of 2017.

Read More

A Facility Renovation Strategy to Accommodate Clinical Cell and Vaccine Production

Published 12/17/2014

The Clinical Cell and Vaccine Production Facility (CVPF) at the Hospital of the University of Pennsylvania is designed to facilitate a bench-to-bedside approach, where the clinical materials to treat disease are manufactured and administered within the hospital using cells from the patient’s own body. The project has achieved international recognition for its unique potential for optimizing patient care and for its success treating human immunodeficiency virus (HIV) and cancer.

Read More

Health Sciences Biomedical Research Facility II

Published 12/17/2014

The seven-story Health Sciences Biomedical Research Facility on the UCSD Health Sciences campus includes wet labs, open lab space, lab support, and administrative support space on five stories above ground; with a vivarium; core lab space; support; and mechanical, electrical, and plumbing systems in the basement. Seven stories of attached administrative office space, interaction spaces and conference rooms are linked by a cast-in-place concrete staircase that climbs seven stories up through the open lobby, and one story down.

Read More

AstraZeneca Plans Cambridge R&D Headquarters

Published 12/9/2014

AstraZeneca will break ground in early 2015 on its $500 million Global R&D Centre and Corporate Headquarters in Cambridge in the United Kingdom. Providing sophisticated pharmaceutical discovery and development facilities, the project will include space for biologics research, high throughput screening, medicinal chemistry, pre-clinical research, and clinical development. The 11-acre campus will accommodate approximately 2,000 employees.

Read More

UCSF Medical Center Completes Mission Bay Hospital Complex

Published 12/4/2014

The University of California, San Francisco Medical Center will open its $1.5 billion hospital complex at Mission Bay in February of 2015. The project comprises the Benioff Children’s Hospital San Francisco, the Betty Irene Moore Women’s Hospital, and the Bakar Cancer Hospital. The 289-bed complex is designed to support the integration of biomedical research with patient care and features advanced imaging suites, a helipad, and a fleet of robotic couriers to deliver supplies, meals, and medications.

Read More

Michigan State University Constructs Bio Engineering Facility

Published 11/26/2014

Michigan State University is constructing the $61 million Bio Engineering Facility in East Lansing. Designed to support interdisciplinary biomedical research, the 130,000-sf building will provide open laboratories and offices for faculty from the colleges of Engineering, Human Medicine, and Natural Science. The sustainably designed facility will be physically connected to the existing Clinical Center C-Wing and Life Sciences B-Wing with proximity to the Radiology Building. Ground was broken on the project in June of 2013 with occupancy expected in fall of 2015.

Read More

Jackson Lab Plans Center for Biometric Analysis

Published 11/25/2014

The Jackson Laboratory will begin construction in 2015 on the $21 million Center for Biometric Analysis in Bar Harbor, Maine. Supporting research on the genetic origins of disease, the four-story, 16,000-sf facility will house advanced technologies for imaging, measurement, gene sequencing, and data processing. The estimated duration of construction is 18 months.

Read More

Dalhousie University Opens Zebrafish Core Facility

Published 11/21/2014

Dalhousie University opened the Zebrafish Core Facility in October of 2014 in Halifax, Nova Scotia. Located in the Life Sciences Research Institute, the $1.8 million laboratory will support interdisciplinary biomedical research on cancer, neuroscience, and genetics. Housing up to 75,000 adult fish, the 4,000-sf facility features a molecular lab and specialized rooms for cell and tissue studies.

Read More