Skip to main content

Operating Cost

Promega Corporation Opens Kornberg Center

Published 4/16/2021

Promega Corporation opened the 283,000-sf Kornberg Center in April of 2021 in Fitchburg, Wis. Designed by Ramlow/Stein and SmithGroup, the three-story facility provides advanced laboratories for core product and technology development in cellular and molecular biology, biochemistry, genetic identity, clinical diagnostics, and scientific applications.

Read More

University of California, Irvine Opens Interdisciplinary Science and Engineering Building

Published 3/26/2021

The University of California, Irvine opened the Interdisciplinary Science and Engineering Building in February of 2021. Designed by LMN Architects with Research Facilities Design (RFD) as laboratory design consultant, the 204,750-sf facility houses the Samueli School of Engineering, the Donald Bren School of Information & Computer Science, and the School of Physical Sciences.

Read More

I2SL Expands Laboratory Benchmarking Tool

Published 8/26/2020

The International Institute for Sustainable Laboratories (I2SL) is expanding the Laboratory Benchmarking Tool. The new Operational Practices Module will enable lab owners and managers see how their building’s policies and practices compare with those of their peers in terms of lab ventilation rates, night temperature setbacks, occupant engagement programs, exhaust dispersion analyses, and other metrics.

Read More

University of North Dakota Plans Nistler College of Business and Public Administration

Published 8/11/2020

The University of North Dakota is planning to break ground in fall of 2020 on the $70 million Nistler College of Business and Public Administration in Grand Forks. Designed by JLG Architects, the four-story, 111,000-sf facility will offer highly flexible learning environments capable of accommodating a wide range of instructional modalities. Technology-enabled classrooms will support a combination of online and in-person instruction, with educational spaces right-sized for appropriate density metrics.

Read More

University of Toronto Plans Passive House Student Residence

Published 7/13/2020

The University of Toronto will begin construction in summer of 2020 on the 265,000-sf Passive House Student Residence on the Scarborough campus. The 746-bed development will accommodate three distinct residential communities, with private study spaces, gathering areas, and kitchen facilities in each cluster. A high-performance building envelope with a vertically patterned aluminum cladding system will frame strategically sized windows, maximizing access to natural light while minimizing heat loss.

Read More

Siemens Offers Three-Part Webinar on Winning Projects Requiring Complex Building Technologies

Published 5/21/2020

Siemens is offering a three-part webinar series: "Winning Projects Requiring Complex Building Technologies." Join David Weaver, Director of Smart Infrastructure at Siemens, for one, two, or all three half-hour sessions to learn how you can meet your clients' expectations and win new projects that require ever more complex and far-reaching technologies. Leveraging these innovative solutions can create the ideal user experience and enhance your reputation as a smart building contractor. Registration includes access to all three events. 

Read More

Siemens Offers Control Panel Online Symposium

Published 4/5/2020

Siemens is teaming up with industry experts from EPLAN, WSCAD, and UL for the Control Panel Online Symposium on April 29, 2019. Industry experts will delve into the latest control panel standards, provide strategies for more efficient control panel designs, and offer tools for the improvement of engineering efficiency. Attendees can join online seminars, visit the virtual fair booths, and chat live with the industry experts.

For more information, visit Siemens.

Read More

FM:Systems Provides Digital Workplace Optimization Webcast

Published 4/5/2020

FM:Systems is offering a webcast on the use of digital solutions to enhance productivity on May 14, 2020. If you would like to build a smarter workplace, optimize space utilization, and enhance employee experience, FM Systems’ strategies will enable you to leverage connected devices and applications to deliver the flexibility that your staff require. By the end of 2020, mobile workers will account for 75 percent of the total workforce.

Read More

Phipps Conservatory's Center for Sustainable Landscapes Attains BREEAM Outstanding

Published 3/10/2020

The Center for Sustainable Landscapes at Phipps Conservatory has attained BREEAM Outstanding certification. The 24,350-sf research, education, and administration facility is the first project in the United States to be awarded the rating, and is the first in the world to meet four other sustainability standards, including The Living Building Challenge, WELL Building Platinum, SITES Platinum, and LEED Platinum.

Read More

Beloit College Dedicates the Powerhouse

Published 3/1/2020

Beloit College dedicated the Powerhouse in February of 2020 in Beloit, Wis. Designed by Studio Gang, the $38 million project included the redevelopment of a decommissioned power plant to create a unique campus hub housing a recreation center, a student union, and an athletics facility. The 120,000-sf riverside complex offers a 160-seat auditorium, meeting and seminar rooms, informal gathering spaces, a swimming pool, a 10,000-sf fitness center, a 17,000-sf recreational gym, a 200-person event space, an elevated indoor track, and a café.

Read More

Yale University Opens Science Building

Published 11/11/2019

Yale University opened the $283 million Yale Science Building in October of 2019 in New Haven, Conn. Housing the entire Molecular, Cellular, and Developmental Biology department, the 280,300-sf multidisciplinary facility also accommodates part of the Molecular Biophysics and Biochemistry department, as well as supporting faculty from physics and chemistry. The collaborative seven-level structure, which includes two floors below grade, features flexible labs that integrate both research and teaching functions in the same space.

Read More

Katerra Constructs Catalyst Building

Published 10/12/2019

Katerra is constructing the $40 million Catalyst Building in Spokane, Wash. The five-story, 150,000-sf facility will accommodate leased space for Eastern Washington University's programs in computer science, electrical engineering, and visual communication design. Comprising two wings connected by a light-filled atrium, the collaborative $40 million building will provide dry labs, offices, classrooms, and study spaces.

Read More

Amgen Breaks Ground on Biomanufacturing Facility

Published 9/3/2019

Amgen broke ground in late July of 2019 on a $200 million biomanufacturing center in West Greenwich, R.I. Featuring a highly flexible, modular design, the next-generation facility will leverage advanced technologies to reduce operational expenses, consume 80 percent less energy and water, and achieve a 75 percent decrease in carbon emissions.

Read More

Applying Passive House Design Principles to Labs and Hospitals

Published 8/14/2019

The Passive House building standard is considered the most rigorous, voluntary energy-based design and construction standard in the industry. Consuming 40 to 90 percent less energy than conventional buildings for heating and cooling, Passive House traditionally has been used in single-family homes, commercial buildings, schools, and office buildings, but the standard is making new strides toward application in energy-intensive laboratory buildings as well. While achieving true Passive House-level performance in a large-scale lab facility is still a far distant (if possible) goal, many of the standard’s fundamental design approaches can be used to significantly reduce energy consumption while improving occupant comfort and air quality.

Read More