Skip to main content

Energy Use Reduction

NASA Langley Research Center Builds Computational Lab

Published 10/28/2014

NASA Langley Research Center began construction in October of 2014 on a $23 million computational laboratory in Hampton, Va. The 40,000-sf facility will provide high-density offices and a consolidated data center to support aeronautical, space exploration, and science research. The general contractor for the sustainably designed project is Turner Construction. Occupancy is expected in August of 2016.

Read More

University of Manchester Builds National Graphene Institute

Published 10/24/2014

The University of Manchester is constructing the $98 million National Graphene Institute in the United Kingdom. Designed by Jestico + Whiles, the facility is being built by BAM Construction with completion expected in spring of 2015. Comprising two isolated concrete structures for vibration mitigation, the five-story, 84,000-sf building will provide 16,000 sf of dedicated cleanroom space as well as optical, laser, chemical, and metrology labs.

Read More

University of Illinois Dedicates Electrical and Computer Engineering Building

Published 10/22/2014

The University of Illinois dedicated the $95 million Electrical and Computer Engineering (ECE) Building in Urbana in October of 2014. Designed by SmithGroup of Chicago, the six-story, 235,000-sf facility provides advanced classrooms, labs, and equipment suites for interdisciplinary research in biotechnology, communications, computing, energy, and nanotechnology.

Read More

University of Ottawa Opens Advanced Research Complex

Published 10/20/2014

The University of Ottawa opened the Advanced Research Complex in October of 2014. The $57 million interdisciplinary facility houses the Centre for Advanced Photonics and features a 44-ton accelerator mass spectrometer. Designed by COLE+Associates Architects, the five-story, 150,000-sf project was built with four vibration-resistant floating floors to accommodate advanced research in geoscience and nanophotonics. LEED Silver sustainable design certification will be sought for the facility, which was built by Pomerleau.

Read More

Colorado State University Expands Animal Science Campus

Published 10/16/2014

Colorado State University opened the renovated Animal Sciences Building in September of 2014. The $19.5 million project created technology-rich classrooms and teaching labs in the 42,000-sf facility. The Animal Sciences Building includes BSL-2 research areas, labs for anatomy and physiology, and instructional space for microbiology and food safety. New mechanical, electrical, and telecommunications systems were installed. Construction began on the LEED-certified project in June of 2012 with completion in August of 2014.

Read More

Filtered Fume Hoods May Dramatically Reduce Financial and Environmental Impacts

Published 10/15/2014

When compared to constant volume hoods (CV), variable air volume (VAV) hoods, and high-performance VAV (“low-flow”) hoods—based on a hypothetical 30-hood, 100,000-sf building—filtered hoods generate significant initial, operational, and environmental savings. This matters because chemical fume hoods used in commercial, research, and instructional laboratories are among the country’s biggest energy hogs.

Read More

University of Bath Opens HIVE Research Facility

Published 10/11/2014

The University of Bath opened the HIVE research facility in September of 2014 in Swindon, U.K. Located in the Building Research Park, the $1.6 million project will support energy efficiency testing for construction materials. The performance of building systems and structural elements can be evaluated in eight individual cells with partial exposure to the external environment. Facilities include a hygrothermal cell for heat and moisture studies, a double-height flexible construction design cell, and a flood cell for water resistance research.

Read More

Central Michigan University Constructs Biosciences Building

Published 10/3/2014

Central Michigan University began construction in September of 2014 on the $95 million Biosciences Building in Mount Pleasant. Designed by Stantec, the four-story, 169,000-sf facility will provide teaching labs, research labs, a BSL-3 suite, lecture halls, classrooms, faculty offices, an auditorium, an herbarium, an imaging center, and an aquatic research vivarium. Occupancy is expected in January of 2017. LEED Silver sustainable design certification will be sought for the project, which is is being built by Clark Construction.

Read More

Environment Hall: The Nicholas School of the Environment

Published 10/1/2014

The five-story, 70,000-sf Duke Environment Hall, home of Duke University’s Nicholas School of the Environment, serves as a living laboratory of sustainable design. The building, which is tracking LEED Platinum, houses the rapidly expanding undergraduate, graduate, and doctoral students in the Environmental Sciences and Policy program.

Read More

SUNY New Paltz Constructs Science Building

Published 10/1/2014

SUNY New Paltz broke ground on a $48 million science building in September of 2014. Designed by ZGF Architects, the two-story, 77,000-sf facility will provide classrooms and labs for STEM (science, technology, engineering, and mathematics) programs. Completion is expected in January of 2017. LEED Silver sustainable design certification will be sought for the project.

Read More

Murray State University Breaks Ground on Breathitt Veterinary Center

Published 9/30/2014

Murray State University broke ground on the new Breathitt Veterinary Center in September of 2014. Located in Hopkinsville, Ky., the $32.4 million facility will provide laboratories for pathology, virology, toxicology, microbiology, clinical chemistry, histology, serology, and molecular diagnostics. Replacing the state’s existing animal disease diagnostic lab, the 53,000-sf project will include a BSL-3 suite as well as technology-rich classrooms and collaborative research space.

Read More

Primary Children's Hospital Opens Outpatient Services Building

Published 9/28/2014

Primary Children's Hospital will open the 240,000-sf Outpatient Services Building in Salt Lake City in October of 2014. Featuring a 300-ft sky bridge to the existing hospital, the six-story addition will provide 67 new exam rooms, offices for clinicians and faculty members, and a medical laboratory. The LEED Silver facility features automated window shades, motion-activated lighting, and window glazing for reduced heat gain. Primary Children's is the pediatric teaching hospital for the University of Utah School of Medicine.

Read More

University of Maryland Plans Center for Computer Science Innovation

Published 9/26/2014

The University of Maryland is planning to build the $140 million Brendan Iribe Center for Computer Science Innovation in College Park. The facility will provide UMD’s Department of Computer Science and the Institute for Advanced Computer Studies with technology-rich labs and workrooms for the study of artificial intelligence, augmented reality, computer vision, robotics, and virtual reality. Designed to support collaborative learning, the LEED-certified project will include classrooms for the College of Computer, Mathematical, and Natural Sciences.

Read More

Construction Begins on Ghana Ridge Hospital

Published 9/24/2014

The new 465,560-sf Ghana Ridge Hospital is being constructed in Accra. The Government of Ghana selected the design-build team of Perkins+Will and Americaribe to create the 600-bed replacement hospital, which will be the largest medical center in the country. The sustainably designed facility will feature passive cooling, solar water heating, and controlled daylight harvesting. The project will be constructed in two phases, with the first 307,000-sf phase providing approximately 400 beds.

Read More

Wistar Institute Opens Fox Research Tower

Published 9/17/2014

The Wistar Institute completed the $100 million Robert and Penny Fox Tower in Philadelphia in September of 2014. Designed by Ballinger to promote interaction and collaboration, the seven-story, 89,000-gsf facility provides advanced biomedical research space for the study of cancer, genetics, and vaccine development. Located on the University of Pennsylvania campus, the project represents an expansion of Wistar's existing facilities and increased the number of labs from 30 to 46, as well as delivering upgraded building infrastructure systems.

Read More