San Francisco State University celebrated the dedication of the Science and Engineering Innovation Center (SEIC) in January of 2025. Delivered by the design-build team of SmithGroup and DPR Construction, the $169 million facility provides advanced laboratories and leading-edge classrooms for the school's STEM education programs. As the new home for the College of Science & Engineering (CoSE), the 125,000-sf building houses the Department of Chemistry & Biochemistry, the School of Engineering, and the dean’s office. The inclusive, student-centered development offers lecture halls and seminar rooms for the entire campus, as well as space for the College of Professional & Global Education. With large windows to admit natural light and put research activities on display, the center includes expansive group work settings and comfortable study spaces.
A large configurable learning venue with interactive audiovisual capabilities enables dynamic group interaction for over 100 students. Three studio-style chemistry classrooms integrate both lab and lecture functionality, and new chemistry research labs support experiments involving protein crystallography, enzyme kinetics, and drug development. Other specialized environments include a maker space, a robotics and mechatronics lab, a structural and seismic engineering lab with a strong wall and floor, and laboratories for the study of power and energy systems.
On track for LEED Gold certification, SEIC is equipped with a microgrid, a rooftop solar array, and a battery back-up power system. The award-winning, all-electric structure incorporates a high-reflectivity cool roof, advanced lighting controls, low-flow plumbing fixtures, high-performance glazing, and an active mechanical heat recovery system with a water-source heat pump. The landscaping showcases adaptive and native plants, bioswales, and no-mow grass to improve resistance to climate change.
The project team, which included engineering firms GPLA and Rutherford + Chekene, leveraged HD BIM (Building Information Modeling) to meet rigorous seismic criteria and optimize coordination with Digital Building Components, the prefabrication contractor. Construction began on the facility in September of 2021.
Organization | Project Role |
---|---|
Architect
|
|
DPR Construction, Inc.
|
Design-Build Contractor
|
GPLA
|
Structural Engineer of Record (Exterior & Interior)
|
Rutherford and Chekene
|
Structural Engineer of Record (Base Building)
|