Skip to main content

Higher Education

UC San Diego Constructs Biomedical Research Facility

Published 4/23/2011

The University of California, San Diego initiated construction in April of 2011 on the Health Sciences Biomedical Research Facility in La Jolla, Calif. The 196,000-sf, five-story building is located on a 3.3-acre site on the School of Medicine campus. The $105 million project was designed by ZGF Architects and is being built by McCarthy.

Read More

Worcester Polytechnic Institute Breaks Ground on Biomanufacturing Education and Training Center

Published 4/22/2011

Worcester Polytechnic Institute broke ground in April of 2011 on a four-story building for the Biomanufacturing Education and Training Center (BETC). Located in Gateway Park in Worcester, Mass., the $30 million center will provide labs, classrooms, and offices for biopharmaceutical education and training. Designed to support industry partnerships, BETC will include a working pilot-scale biomanufacturing plant. The 92,000-sf project is supported by funding from the Massachusetts Life Sciences Center.

Read More

UW-Madison Builds Second Tower at Wisconsin Institutes for Medical Research

Published 4/22/2011

The University of Wisconsin-Madison began building a second tower at the Wisconsin Institutes for Medical Research in April of 2011. The $134.8 million, nine-story facility will support research in cardiovascular diseases, cell and regenerative biology, molecular medicine, neurodegenerative diseases, eye research, and cancer. Occupancy is expected in fall of 2013. Construction on a third tower at the site could begin in 2014.

Read More

SUNY Upstate Medical University Expands Institute for Human Performance

Published 4/21/2011

SUNY Upstate Medical University broke ground on a $72 million expansion of the Institute for Human Performance in April of 2011. Located in Syracuse, N.Y., the 158,273-sf project will support research on behavioral disorders, neurodegenerative diseases, and visual system disorders. The facility will be constructed adjacent to the existing Institute for Human Performance and is slated for completion in 2013.

Read More

UC San Diego Expands Rady School of Management

Published 4/20/2011

The University of California, San Diego is building a 50,000-sf addition to the Rady School of Management. The five-story project comprises two buildings connecting to the existing facility. The expansion will house two auditoriums, instructional space, research labs, offices, and executive education classrooms. The project team includes architect Ellerbe Becket and construction manager Swinerton Builders. LEED Gold sustainable design certification will be sought for the facility.

Read More

Rochester Institute of Technology Breaks Ground on Golisano Institute for Sustainability

Published 4/19/2011

Rochester Institute of Technology broke ground on the $35 million Golisano Institute for Sustainability in April of 2011 in Rochester, N.Y. The 75,000-sf project is support by a $13.1 million NIST construction grant and $10 million in funding from the state of New York. The multidisciplinary facility will provide labs, classrooms, and conference rooms for research and development of sustainable business practices.

Read More

University of Texas at El Paso Builds Health Science Building

Published 4/18/2011

The University of Texas at El Paso is building a $60 million facility for the College of Health Sciences and School of Nursing. The four-story, 130,000-sf building will feature 16,000 sf of clinical simulation laboratories, a 4,500-sf biomedical research facility, classrooms, and seminar rooms. Construction began on the project in November of 2008. Occupancy is expected in fall of 2011.

Read More

University of Maine Expands Advanced Structures and Composites Center

Published 4/17/2011

The University of Maine is engaged in a $22.4 million expansion of the AEWC Advanced Structures and Composites Center in Orono. The 35,000-sf facility includes a 2,500-sf nanocomposites laboratory, offices, classrooms, and the Offshore Wind Laboratory. The wind lab features a reaction wall and floor for structural testing of wind turbine blades as well as an environmental simulation area and a wave-wind basin. A robotic composite manufacturing suite will produce turbine blades on site.

Read More

University of Rochester Medical Center Opens Clinical and Translational Science Building

Published 4/16/2011

The University of Rochester Medical Center opened the $76.4 million Saunders Research Building in April of 2011 in Rochester, N.Y. The 200,000-sf interdisciplinary facility houses labs, offices, classrooms, and the Clinical and Translational Science Institute. Ground was broken on the project in October of 2008. LEED sustainable design certification will be sought for the facility.

Read More

University of Michigan Breaks Ground on Center of Excellence in Nanomechanical Science and Engineering

Published 4/15/2011

The University of Michigan broke ground on the $46 million Center of Excellence in Nanomechanical Science and Engineering in Ann Arbor in April of 2011. The 62,800-sf facility will support interdisciplinary research in nanoengineering, imaging and optics, materials, biosystems, micro-bioengineering, mechanics and mechanical testing, and microdynamics. The three-story center will house 60 lab modules, eight specialized chambers, faculty offices, and a subterranean lab built to minimize vibration. Completion is expected in mid-2013.

Read More

Columbia University Breaks Ground on Manhattanville Campus

Published 4/14/2011

Columbia University broke ground on its Manhattanville Campus in New York in March of 2011. The 17-acre site in West Harlem will house several new buildings including the Jerome L. Greene Science Center for Mind, Brain, and Behavior which is slated for completion in 2015. Columbia’s Manhattanville campus will meet LEED for Neighborhood Development (LEED-ND) standards. The project team for the LEED-ND program includes Renzo Piano Building Workshop and architects Skidmore, Owings & Merrill.

Read More

Epworth Deakin Teaching Hospital Plans Waurn Ponds Facility

Published 4/14/2011

Construction will begin in late 2011 on the $255 million Epworth Deakin Teaching Hospital in Waurn Ponds, Victoria. The 256-bed facility represents a partnership of Epworth Healthcare and Deakin University. The first phase of construction is slated for occupancy by 2013 and will provide 160 beds and an emergency department.

Read More

Indiana University Breaks Ground on Jacobs School of Music Expansion

Published 4/12/2011

Indiana University broke ground on the $44 million Jacobs School of Music Faculty Studio Building in Bloomington in April of 2011. Designed by Flad Architects with Browning Day Mullins Dierdorf as architect of record, the 85,000-sf (99,500-gsf) expansion will provide 84 teaching studios, 15 classrooms, practice rooms, administrative offices, and rehearsal rooms.

Read More

Ryerson University Plans Student Learning Centre

Published 4/10/2011

Ryerson University will begin building the $112 million Student Learning Centre in Toronto in January of 2012. Designed by Snøhetta Architects and the Zeidler Partnership, the seven-story transparent glass structure will provide open environments for group learning. Connecting to Ryerson’s adjacent library, the building will include ground-level retail and 2,000 study spaces. Completion is expected in 2015.

Read More