Skip to main content

Animal Research

CDC Power Outage Prompts Congressional Consideration of Biocontainment Security

Published 9/1/2007

The House of Representatives Energy and Commerce Committee will hold a hearing in early October of 2007 to evaluate the safety and security issues of biocontainment and infectious disease research facilities. Prompted in part by the June 15, 2007 power failure at the CDC’s new $214 million laboratory in Atlanta, the session will investigate recent releases and incidents at high containment sites.

Read More

Dept. of Homeland Security Plans National Bio and Agro Defense Facility

Published 8/31/2007

The Department of Homeland Security’s Science and Technology directorate is exploring possible sites for its proposed $500 million National Bio and Agro Defense Facility (NBAF). Locations include Flora, Miss.; Kansas State University in Manhattan, Kan.; Texas Research Park in San Antonio; Umstead Research Farm, N.C.; the University of Georgia in Athens; and Plum Island, N.Y., the location of the existing BSL-3 Animal Disease Center which the NBAF will replace.

Read More

Oakwood Research To Construct Rabbit Facility

Published 8/23/2007

Oakwood Research Facility, a breeder of pathogen-free rabbits for medical research, received approval in July of 2007 to construct a rabbit facility in Attica Township, Michigan. The planned facility will be comprised of three 8,000-sf pathogen-free barns. Oakwood Research provides rabbits to the Indiana-based lab animal distributor Harlan Sprague Dawley, whose clients include the University of Michigan Ann Arbor Medical School, Michigan State University, The Cleveland Clinic, and Duke University.

Read More

USDA Dedicates Ames Biocontainment Facility

Published 7/29/2007

The U.S. Department of Agriculture dedicated its high containment large animal facility in Ames, Iowa in July of 2007. As the second component of a multi-phase, $460 million project, the state-of-the-art animal health center will accommodate research on a variety of endemic, zoonotic and foreign animal diseases. Housing BSL-3 laboratories, the facility was constructed in three and a half years and cost approximately $85 million. The new building contains more than 155,000 sf and will house cattle, bison, elk, deer, reindeer, sheep and hogs.

Read More

UC Davis Occupies Veterinary Medicine Facility

Published 7/23/2007

UC Davis completed construction of the 125,000-sf Veterinary Medicine III A building in summer of 2007. The $77 million facility houses classrooms and research space to enable consolidation of the School of Veterinary Medicine in a single location. The project began construction in March of 2002 and was publicly funded.

Read More

Centre for Phenogenomics Opens in Toronto

Published 7/14/2007

The Centre for Phenogenomics completed its $50-million facility in the Lebovic Research Centre in Toronto in mid-2007. The 120,000-sf, 180,000-mouse facility houses research laboratories for the study of physiological phenotyping, generation of mutant mice, behavioral analysis, imaging, pathology, and cryopreservation. The project team included engineering firms LKM and SNC-Lavalin Engineering & Technology.

Read More

Cornell University Opens Animal Research Facility

Published 6/25/2007

Cornell University celebrated the opening of the 79,000-square-foot East Campus Research Facility (ECRF) on June 26, 2007. Housing approximately 45,000 mice, including transgenic strains, the $55-million building will also accommodate rats, woodchucks, guinea pigs, hamsters, and chickens. Part of Cornell's $600-million New Life Sciences Initiative, the consolidated animal research facility was five years in the making and is expected to be fully operational in fall of 2007. The project was designed by Philadelphia-based Ballinger.

Read More

Covance Proceeds with Chandler Animal Lab Construction

Published 4/2/2007

Covance is constructing a 300,000-sf animal testing laboratory in Chandler, Arizona. The facility broke ground in June of 2007 and is slated to begin operations in early 2009. Construction was temporarily halted by a lawsuit which called into question the building permit and zoning for the facility due to alleged non-public meetings between the City of Chandler and Covance. The case was dismissed in February of 2008, allowing construction to resume.

Read More

UC Davis Plans Primate Research Center Expansion

Published 2/13/2007

UC Davis is proposing to construct five new buildings at the California National Primate Research Center in Davis, Calif. A $5.3-million, 10,000-sf building would accommodate virology and immunology research and would include a 1,100-sf BSL-3 laboratory. Four additional modular buildings would have a footprint of approximately 1,500 sf each, two comprised of laboratory space and two housing office space. Each of the modular buildings would cost approximately $800,000.

Read More

Iowa State University Initiates Veterinary Renovation and Expansion

Published 1/23/2007

Iowa State University (ISU) began construction in late 2006 on the first phase of a $51-million renovation of its Veterinary Diagnostics Laboratory and Veterinary Teaching Hospital. The project includes renovations to the existing 100,000-sf facility and a 55,000-sf addition housing an advanced imaging facility with improved biocontainment capabilities. The second project phase entails renovations of a vacant small animal facility to enable future expansion. Both phases are expected to reach completion in late 2009.

Read More

University of Saskatchewan Develops Vaccine Institute

Published 1/3/2007

The University of Saskatchewan has begun construction on the $110 million International Vaccine Center (InterVac) in Saskatoon. Designed by Smith Carter of Winnipeg, the 165,000-sf facility will include large animal testing facilities and BSL-3 containment laboratories for infectious disease and vaccine research.

Read More

Neurobiological Technologies Opens Pharmaceutical Vivarium

Published 12/3/2006

Emeryville, Calif.-based Neurobiological Technologies, Inc. (NTI) opened a new pharmaceutical vivarium in Moorrege, Germany, in winter of 2006. The facility is owned and operated by NTI’s partner, Nordmark Arzneimittel GmbH, and houses Malayan pit vipers for the production of Viprinex®, a drug for the treatment of strokes. The GMP facility currently houses 100 snakes and could eventually contain up to 1,500.

Read More

AMDeC Creates Multi-Institution Rodent Housing Facility

Published 10/20/2006

AMDeC Co., a consortium representing 35 medical institutions in the New York area, is creating a multi-institutional rodent housing facility in Yonkers, New York. Holding up to 80,000 cages and 40,000 mice, the facility will enable institutions such as Columbia University, Rockefeller University, the New York University School of Medicine, and the North Shore-Long Island Jewish Health System to share space and equipment for research.

Read More

University of Wisconsin Dedicates Veterinary Diagnostic Laboratory

Published 9/25/2006

The University of Wisconsin-Madison School of Veterinary Medicine dedicated the 78,000-sf Wisconsin Veterinary Diagnostic Laboratory on Oct. 2, 2006. The facility will test for animal diseases including chronic wasting disease, mad cow disease, and avian influenza. The building, which reached completion in September 2006 after two years of construction,  includes a self-contained 1,200-sf BSL-3 facility, an electron microscope installed on a floating floor, and a 4,000 pound capacity tissue digester.

Read More