State University of New York (SUNY) College at Oneonta Physical Science Building

Published 1/31/2018
Previous Next

The SUNY College at Oneonta’s extensive rehabilitation of the Physical Science Building (PSB) includes renovation of 58,000 gsf and 18,000 gsf in new construction. The 1970s brick building with a concrete structure required replacement of about 70 percent of the exterior envelope, including the northwestern elevation to control glare and solar heat gain. The brick addition complements the style of the campus at large, with syncopated windows facing southeast, and glass and metal panel accents all around.

The state-of-the-art facility provides teaching laboratories for anthropology, physics, and chemistry. Research laboratories promote undergraduate research in all these disciplines. An anthropology teaching gallery allows students to work in a museum-quality space as part of their coursework. Other spaces include the College’s first technology enabled active learning (TEAL) classroom, faculty offices, student spaces, and a Science Discovery Center (SDC) for community outreach programs. 

The interface between the addition and the renovated building is a sky-lit Commons, extending eastward into a main entry plaza, welcoming pedestrians coming from the main academic campus. 

The east-west pedestrian connection between Human Ecology and PSB is laced with landscaped pockets, and is designed to create a sense of place for the community; a paved cross-connection between Human Ecology and PSB is home to the alumni-donated clock and bicycle racks.

At the west end of the addition, a bio-retention landscape raises student awareness about storm-water management. At the east end, repurposed granite blocks provide an opportunity for outdoor learning or seating for children visiting the SDC.

The existing building constraints, such as the 12-foot floor-to-floor height, required creative infrastructure design solutions including use of chilled beam technology for 70 percent of the building; mixed-mode ventilation in the Commons, allowing natural cross-ventilation in the shoulder seasons; and sensor technology in the labs tied to the building management system, providing real-time assessments of air quality. These systems enabled a reduction in primary equipment, a shallow ductwork distribution network, and higher ceilings with up-lighting in occupied spaces. Post-occupancy feedback confirms an energy use intensity of 90 kBtu/sf/year—a 10 percent improvement over predicted energy usage, rendering the building 67 percent carbon neutral relative to the US average of this building type.

An interactive energy dashboard in the Commons displays real-time building energy and water use data, and is intended to promote conservation efforts by the building users.

Organization Project Role
Ellenzweig
Architect
Fahs Construction Group
General Contractor
Environmental Design & Research
Landscape Architect
Bard, Rao & Athanas Consulting Engineers
MEP/IT Engineer
LeMessurier Consultants Inc.
Structural Engineer
Watts Engineering
Civil Engineer
A&J Consulting Engineering Services
Plumbing/Fire Protection Engineer
Atelier Ten
Sustainability Consultant
Walters-Storyk Design Group
Audio-Visual Consultant
Bard, Rao & Athanas Consulting Engineers
Security Consultant
Jennifer Pieszak Lighting Design
Lighting Design
MoharDesign
Furniture
Fisher Associates
Geotechnical
Watts Engineering
Hazardous Materials
Ellana
Cost Estimating
Haakon Industries
Factory Built-Up Air Handlers
MultiStack
Centrifugal Water Chillers
Marley Cooling Tower Co.
Cooling Tower
Johnson Controls Inc.
Building Controls
Aircuity Inc.
Air Quality Monitoring System
Cummins Power Systems LLC
Emergency Generator
Mott Manufacturing
Fume Hoods
Glen-Gery Corporation
Brick Masonry
3A Composites
Composite Metal Panel
Kingspan Insulated Panels, Inc.
Insulated Metal Panel
EFCO Corporation
Curtainwall and Window System
Firestone Building Products Co.
Roofing System