Skip to main content

Washington University Completes Biomedical Engineering Building

Published 4/30/2003

Washington University has recently completed the 114,000-sf Whitaker Biomedical Engineering facility in St. Louis. The $33-million facility houses 22,000 sf of wet and dry laboratory space, including 18 advanced technology labs, and 3,000 sf of vivarium space. The structure also includes a 240-seat auditorium and 45 faculty and student offices. The project was designed by architect SBRA of Boston and built by contractor McCarthy.